Cedar shingle roof installation guide.
Cover the roof with roofing felt.
Secure it to the.
This document will help you with the installation of your cedar shake and shingle roofs.
Looking for a dealer in your area.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
Shake shingle roof application instructions feb 10 2017.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
Cedar shingle application cedar shake application.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
Click on the below links to view the full application instructions for.
The jb western red cedar shingles from marley are a lightweight roofing and cladding solution with a high degree of natural thermal insulation.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Nail a shingle at the end of each wall with the proper overhang and snap a chalk line to serve as a guide for the row.
Return to all blogs.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
How to install a cedar shingle roof on a garden shed step 1.
Using this chalk line method extend the first row around the entire shed.
A guide to installing cedar shingles.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
Joints in any one course should have a side lap of no less than 38mm from the joint in adjacent courses and in any 3 courses no 2 joints should align.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.